How To Repair A Hole In A Metal Septic Tank
This project consisted of u.s.a. replacing an sometime metallic septic tank at Table Rock Lake with a new poly septic tank that meets the Missouri land and Stone County regulations.
Click on the images below to run into a step by step procedure of this projection.
Locating quondam metallic tank before paradigm.
Upon initial excavation, we institute a rusted out hole in the top of the tank.
Additional excavating revealed that the tank was caved in and the inlet pipe was crushed.
A closeup shot of the damaged outlet pipe reveals a large root wad headed toward the dispersal line.
We pumped the septic tank prior to removal.
Sewage disposal truck hauling away waste.
Tank inlet pipe has been exposed and cut to avoid agonizing inlet pipage during tank removal.
Root wad removed from pipage between tank outlet and dispersal line.
Inspecting pipe leading to dispersal line afterwards root wad removal.
Line that root wad was removed from is capped to keep dirt out during tank removal.
Removing metallic septic tank with backhoe.
Demolishing old tank after removal.
Compacted erstwhile tank for easy disposal.
Nosotros installed temporary supports for deck and stairway during tank excavation.
We encountered solid rock later removing onetime tank.
Stone breaking with backhoe to allow access of new tank installation.
Installing a new Envirotek Systems E1000GF poly tank.
Installed our Envirotek Systems model 2424 riser/chapeau assemblies after select gravel back fill and compaction for easy futurity tank maintenance.
We compacted gravel effectually tank and lines.
Nosotros reinforced deck supports afterwards dorsum filling.
Deck, stairway and retaining wall restored. New Envirotek Systems tank and riser assemblies to grade, consummate with topsoil and terminate grading.
Before Image
The location of the septic tank inlet has been electronically located and the hole is directly higher up tank inlet.
Step i
A hole appears revealing a rusted out metallic septic tank subsequently outset the initial digging.
Step 2
Subsequently additional digging more of the failed metal tank is revealed as well as a damaged outlet pipe connected to the dispersal line.
Footstep 3
A closeup shot of the damaged outlet pipe reveals a large root wad headed toward the dispersal line.
Footstep iv
Tank being cleaned and pumped before farther excavation.
Pace five
Pump truck preparing to haul sludge to country approved disposal site.
Step six
Tank inlet pipe has been exposed and cut to avoid agonizing inlet pipe during tank removal.
Step vii
Root wad removed from pipe between tank outlet and dispersal line.
Step 8
Inspecting pipe leading to dispersal line after root wad removal.
Step nine
Line that root wad was removed from is capped to keep clay out during tank removal.
Stride ten
Metal tank removed.
Step 11
Demolishing metal tank.
Stride 12
Metal tank demolished and folded.
Pace 13
We added temporary supports for deck and stairway during tank digging.
Step 14
Solid rock encountered afterwards metal tank removal at beginning of excavation for new Envirotek Systems E1000GF poly tank.
Step xv
Initial rock breaking has begun.
Step 16
Poly tank prepare on gravel bedding after rock removal is complete.
Step 17
Envirotek Systems E1000GF Poly tank consummate with Envirotek Systems model 2424 riser/lid assemblies after select gravel back fill and compaction. Inlet piping with double clean-out on left. Outlet pipage to dispersal field on right.
Step 18
Base rock compacted and prepped for retaining wall reconstruction.
Step xix
Deck and stairway mail service re-supported.
Step 20 – After Epitome
Deck, stairway and retaining wall restored. New Envirotek Systems tank and riser assemblies to form, complete with topsoil and finish grading.
A Few Details Virtually This Tank Replacement Project
This project had a variety of site conditions which raised the degree of difficulty.
The site is a lakefront lot built on a bluff that overlooks Table Rock Lake. The but access was from an eroded driveway edge which was addressed earlier accessing the tank location.
A very steep equipment access ramp was built with spoils from the tank area. Additionally, the tank was located underneath an existing retaining wall, stairway and deck support posts. Temporary support braces were installed to protect the integrity of the existing deck, stairway and house foundation during the tank removal and installation procedure.
A very narrow equipment access was constructed while protecting the original natural landscape.
Whether you need a metal septic tank replaced or repaired, you tin can look professional person service backed by quality workmanship!
Call or Request Estimate!
Source: https://enviroteksystems.com/portfolio/septic-systems/metal-septic-tank-replacement-table-rock-lake-1-2-2017/